Benefits of Multi-level stock assembly module

Streamlined Production Processes

Firstly, with one-click assembly, you no longer needs to record every intermediate step. The system automates deductions across multiple layers of Bill of Materials (BOM). Thus, speeding up operations.

Costing Accuracy

Secondly, the module auto-calculates finished goods costs by aggregating costs from each sub-item and child item. Thus, ensuring that the pricing reflects current market values and production costs.

Real-Time Inventory Sync

Thirdly, each component’s stock level is updated immediately. Thus, reducing discrepancies and enhancing real-time stock control.

Setting Up the assembly module in autoCount

How to Enable the Module

To begin, ensure that the Assembly Module has been purchased and activated:

  • Firstly, navigate to ‘Tools’ > ‘Program Control’ > ‘Module Setting’
  • Secondly, tick the checkbox for ‘Multi-Level Assembly’
  • Thirdly, click ‘OK’ to confirm
multi-level stock assembly module

Accessing Module Settings

Once activated, the module settings can be accessed under the stock management section, where users can configure BOM and material deduction rules.

Understanding Semi-Finished Goods and BOM Structure

Defining Semi-Finished Goods

Semi-Finished Goods are partially completed products used as components in final assemblies. For example, a bicycle wheel is a semi-finished good.

Creating Accurate BOM Hierarchies

Setting a structured BOM (Bill of Materials) is essential:

  • Firstly, go to ‘Stock’ > ‘Stock Item Maintenance’
  • Secondly, seAftlect a semi-finished product and click ‘Edit’
  • After that, under the BOM section, list the required raw materials
multi-level stock assembly module

Ensure to update BOM costing using the option: Up-To-Date Cost from sub items up-to-date-cost.

Step-by-Step setup for multi-level assembly

Configuring Semi-Finished Goods

Example: Semi-Finished Goods 1 (e.g., bicycle frame)

  • Firstly, remove obsolete raw materials
  • Secondly, insert current materials with accurate quantities

Assigning Raw Materials

Use updated inventory codes and assign:

  • Raw Material 1: Quantity = 3
  • Raw Material 2: Quantity = 2
multi-level stock assembly module

Setting Update BOM Cost Rules

Always apply the rule to reflect real-time costing from child items.

Managing Finished Goods in Multi-Level BOM

Replacing Raw Materials with Semi-Finished Goods

In the BOM of Finished Goods:

  • Firstly, remove raw material used in semi-finished goods
  • Secondly, add the relevant semi-finished good as a replacement

Inquiring BOM Material Analysis

Use the following:

  • ‘Inquiry’ > Check ‘BOM Material Inquiry’
  • Enable ‘Multi-Level’ option for full material breakdown

Using the Multi-Level assembly functionality

Converting to Multi-Level View

When creating a new Stock Assembly:

  • Firstly, select ‘Finished Goods 1’
  • Secondly, use ‘Convert to Multi-Level’ to reveal component structure
multi-level stock assembly module

Impact on Raw Material Deduction

Without conversion, the system doesn’t deduct raw materials from sub-items. With it, deductions occur automatically. Thus, enhancing accuracy.

Stock Assembly Section Enhancements

Auto Update & Costing Calculations

The system:

  • Deducts stock from both sub-items and child items
  • Calculates cost automatically from all levels

Manual Adjustments and Tracking

Users can still manually adjust components before finalizing the assembly

Implementing BOM Option for Shild Items

How BOM Options Work?

BOM Options allow flexible substitution when material run low.

Setting Up Alternative for Raw Materials

Go to: 

  • ‘Stock’ > ‘BOM Optional’
  • Create a new rule:
    • E.g., If Raw Material 1 is short by 3, replace with 3 units of Raw Material 2
multi-level stock assembly module

Using BOM Option with finished and semi-finished goods

Configuration Examples

  • Finished Goods 1: Replace Packaging Material 1 with Packaging Material 2
  • Semi-Finished Goods 1: Replace Raw Material 1 with Raw Material 2
multi-level stock assembly module

Material Substitution Scenarios

Enable Apply BOM Optional with the Child Item checkbox for substitutions at all levels.

Analyzing Sub-Item composition with BOM Inquiry

Multi-Level Filter Options

AutoCount provides an in-depth BOM Material Inquiry tool that enables users to analyze the entire composition of a finished product, even when multiple layers of sub-assemblies are involved.

Steps: 

  • Firstly, go to ‘Inquiry’ > ‘Check BOM Material Inquiry’
  • Secondly, select the desired ‘Finished Goods’
  • Thirdly, check the ‘Multi-Level’ box
  • After that, click ‘Inquiry’ to view full sub-item breakdown

This feature is particularly useful when dealing with complex products composed of several semi-finished components and ensures visibility at every level.

Real-Time Breakdown of Assemblies

The system not only displays the primary BOM components but also drills down into each sub-item to display their raw materials, costs and availability in real time. This functionality simplifies production planning and inventory forecasting.

Reporting and Inventory monitoring features

Common Use Cases for Manufacturers and assemblers

Real-World Scenarios

  • Bicycle Manufacturing: Frame, wheels and gears are semi-finished goods that get assembled into a complete unit.
  • Furniture Production: Tables with pre-assembled legs and tops combined into final pieces.
  • Electrics Assembly: Semi-finished circuits and boards integrated into final gadgets.

Industries Benefitting Most

  • Automotive
  • Consumer Electronics
  • Furniture and Home Decor
  • Packaging and Plastics
  • Industrial Equipment

These industries often require nested assembly workflows, which makes the Multi-Level Stock Assembly module a game-changer.

Integration with other autoCount modules

Stock, Sales and Manufacturing Modules Synergy

When integrated with other AutoCount modules, Multi-Level Stock Assembly becomes even more powerful:

By synchronizing these modules, AutoCount ensures consistency across departments and eliminates redundancy.

Tips for effective use of the module

Best Practices:

Avoiding Common Pitfalls:

Technical Support Hotline

AutoCount User Manual

Online Knowledge Base

Trusted AutoCount Dealer

Conclusion

To conclude, the AutoCount Multi-Level Stock Assembly Module is a robust solution for businesses that require precision and efficiency in manufacturing. It automates raw material deduction, maintains real-time stock accuracy and ensures cost integrity through multi-layer BOM integration. So, whether you are assembling bicycles, electronics or furnitures, this module offers the tools that manage complex workflows with ease.

As a result, by following the guidelines and best practices in this guide, businesses can achieve higher productivity, reduced errors and improved profitability using AutoCount’s ERP platform.

FAQs

It streamlines the production process by allowing a single-step assembly of finished goods from multiple levels of components, saving time and improving accuracy.

Yes, by using the BOM Optional feature, you can configure alternative materials that auto-replace when the primary item is insufficient.

Absolutely! It scales according to the business size and works well for both small workshops and large manufacturing units.

Enable ‘Update BOM Cost’ to pull the latest cost from sub-items and regularly review your BOM configurations.

The system will not deduct the raw materials used in the semi-finished goods, leading to inaccurate stock and costing records.

Yes, the BOM Material Inquiry and Stock Assembly Reports provide full visibility across all layers of assembly.

Table Of Content
news-2011

yakinjp


sabung ayam online

yakinjp

yakinjp

yakinjp

rtp yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

yakinjp

judi bola online

slot thailand

yakinjp

yakinjp

3 pola rahasia gates of olympus wd 5 juta

jam rawan max win starlight princess 45 menit

modal 50 ribu mahjong ways 3 free spin

incar x1000 big bass bonanza pola turbo manual

panduan anti rungkad sweet bonanza profit 100

skema bet wild west gold sticky wild

trik wd aman 1 juta sugar rush pola spin

pola otomatis gates of gatotkaca max win

100 putaran lucky neko strategi hit and run

trik free spin the dog house bet bertahap

1006

1007

1008

1009

1010

1011

1012

1013

1014

1015

1116

1117

1118

1119

1120

1121

1122

1123

1124

1125

1126

1127

1128

1129

1130

1131

1132

1133

1134

1135

rumus kemenangan mahjong ways 3 bet spin efektif

rahasia rtp mahjong wins peningkatan taruhan

analisis akurasi prediksi rtp live hasil spin

pola spin khusus lucky neko kucing emas

strategi multiplier stabil gate olympus emosi

trik mas adi manual spin mahjong ways spin emas

efektivitas pola spin ganjil genap koi gate

analisis kemenangan mahjong ways mobile vs desktop

pola pikir anti serakah target kemenangan harian

strategi anti boncos wild bandito stop kemenangan

akuntan gates of gatotkaca buy spin max win

sopir madame destiny megaways 100x spin

peneliti koi gate re spin naga jam sepi

arsitek aztec gems polanya multiplier x15

barista main spaceman cash out profit 70

bedah pola auto ajaib gates of olympus

rahasia rng lock mahjong ways 2 free spin

strategi waktu emas wild bandito tumble multiplier

volatilitas the dog house bonus buy optimal

dampak big win starlight princess stop loss wd

1011

1012

1013

1014

1015

1016

1017

1018

1019

1020

1111

1112

1113

1114

1115

1136

1137

1138

1139

1140

1141

1142

1143

1144

1145

strategi anti rungkad sweet bonanza atur bet saat scatter

pola putaran pancingan simbol scatter terbaik gates of olympus

taktik bet cerdas gems bonanza memicu game bonus

deteksi akurat waktu terbaik mengambil bonus deposit game

pola spin normal jebol kemenangan bonus turnover tertinggi

deteksi waktu terbaik ambil bonus deposit volatilitas rendah

pola spin normal jebol kemenangan bonus pengganda tertinggi

pola push bertahap volatilitas tinggi kemenangan tingkat tinggi

kombinasi bet minimalis volatilitas rendah anti zonk bonus x300

analisis pola gacor habanero fa cai shen strategi stabil untung

pola turbo pause mahjong ways 2 jackpot x1000 pasti

pola simbol scatter pyramid bonanza terbongkar menang

15 menit cetak big win wild west gold tanpa buy

deteksi sistem bocor pola gacor sweet bonanza anti rungkad

kombinasi simbol scatter gate of olympus wild biru wd

sinkronisasi jeda spin mahjong ways 2 kemenangan beruntun

analisa rtp pg soft wild stacked alur permainan

trik mas eko turbo spin mahjong wins suhu ponsel

dog house analisis rtp maksimal volatilitas server

efektivitas spin berantai big win treasures of aztec

peran ai pragmatic play frekuensi scatter

strategi mahjong ways jumlah pemain aktif

fakta menarik mahjong ways 2 potensi maxwin

pola pikir profesional tempo roulete sicbo

turbo spin tiga langkah starlight princess x500

montir sugar rush pola 20 10 5 pengganda

koki hot hot fruit volatilitas tinggi x5000

teknisi it wisdom of athena bet progresif

desainer wild west gold sticky wilds wd

perawat lucky neko perkalian ganda cuan

1026

1027

1028

1029

1030

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1146

1147

1148

1149

1150

1151

1152

1153

1154

1155

teknik anti lag mahjong ways 2 freespin

pola pragmatic beli spin jam ramai

kode rng gates olympus scatter zeus

strategi golden bet starlight princess perkalian

volatilitas mahjong ways 1 vs 2 konsistensi

martingale terbalik dog house multihold wild

manajemen modal pro player batasan loss

psikologis kemenangan beruntun pemain profesional

trik mas andre auto spin turbo

analisis rtp live tren kemenangan global

sinkronisasi spin manual micro detik wild

beli fitur vs auto spin pg soft

analisa historis mahjong ways 2 jam subuh

kunci perkalian x500 gatot kaca maintenance

peran algoritma provider perubahan jam server

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1096

1097

1098

1099

1100

1156

1157

1158

1159

1160

1161

1162

1163

1164

1165

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1081

1082

1083

1084

1085

1086

1087

1088

1089

1090

1091

1092

1093

1094

1095

1166

1167

1168

1169

1170

1066

1067

1068

1069

1070

1071

1072

1073

1074

1075

1076

1077

1078

1079

1080

1171

1172

1173

1174

1175

1176

1177

1178

1179

1180

1181

1182

1183

1184

1185

news-2011